P77 – WHITENING SYSTEM – PMD

AGD (2013)

Project Details

  • CLIENT  AGD
  • DATE  8 july, 2013
  • TAGS  Agroindustry

Project Description

Detailed engineering of the blanching line for the General Deheza Peanut Plant, located in General Deheza, Province of Córdoba.

Stages:

  • Survey of floors and industrial warehouse floor. Existing base plans.
  • Plant layout redesign. Preliminary design of hoppers and structures.
  • Design and Calculation of Duct Structures, Hoppers and Supports.
  • Design and Calculation of Bases of Equipment and Structures.
  • Design and definition of size and section of downspouts.
  • Suction ducts.
  • Civil and Mechanical Project Schedule.